Proper operations and matenance of low impact development facilities dictate whether the intended benefits are realized. This fact sheet helps inform project planners, designers, contractors and others of their roles in maintaining the system after it is built.


Fact sheets in the “Low Impact Development” series include: Rain Gardens (ORESU-G-11-001), Porous Pavement (ORESU-G-11-002), Vegetated Filter Strips (ORESU-G-11-003), Drywells (ORESU-G-11-004), Stormwater Planters (ORESU-G-11-005), Swales (ORESU-G-11-006), Green Roofs (ORESU-G-11-007), Infiltration Testing (ORESU-G-11-008), Soakage Trenches (ORESU-G-11-009), The LID Site Planning Process (ORESU-G-14-003), Low Impact Development in the Design Phase (ORESU-G-14-006), Low-Impact Development in the Construction Phase (ORESE-G-14-005), and Low Impact Development in the Maintenance Phase After Construction (ORESU-G-14-004).
Authors: 
Maria Cahill
How to Order : 

Free download: accessible .pdf

Product Number: 
ORESU-G-14-004
Year of Publication: 
2014
Price: 
Free
Length: 
5 pages
Size and Format: 
8.5x11-inch printable booklet