A thoroughly design process is needed to ensure that proposed low impact development facilities function optimally according to the desired outcomes. This fact sheet points out key hydraulic and hydrologic considerations that apply generally to LID projects.


Fact sheets in the “Low Impact Development” series include: Rain Gardens (ORESU-G-11-001), Porous Pavement (ORESU-G-11-002), Vegetated Filter Strips (ORESU-G-11-003), Drywells (ORESU-G-11-004), Stormwater Planters (ORESU-G-11-005), Swales (ORESU-G-11-006), Green Roofs (ORESU-G-11-007), Infiltration Testing (ORESU-G-11-008), Soakage Trenches (ORESU-G-11-009), The LID Site Planning Process (ORESU-G-14-003), Low Impact Development in the Design Phase (ORESU-G-14-006), Low-Impact Development in the Construction Phase (ORESE-G-14-005), and Low Impact Development in the Maintenance Phase After Construction (ORESU-G-14-004).

Authors: 
Maria Cahill
How to Order : 

Free download: accessible .pdf

Product Number: 
ORESU-G-14-006
Year of Publication: 
2014
Price: 
Free
Length: 
11 pages
Size and Format: 
8.5x11-inch printable booklet